Freightliners
Farm - Tea House
This
Project began on 11th August 2003. The building was designed by
Ting Na Chen (RIBA) and the project manager is Simon Hepburn from
the farm's carpentry workshop.
HBC
did the primary groundwork by laying all the drainage then contributed
several volunteers to work on the foundation structure for the
first year of the build after which we left to concentrate on
other projects.

|
The
site is an urban farm in Islington, London and the structure will
be built of green oak post and beams with straw bale infill on
three sides. It is also hoped that the structure will possess
a sedum extensive green roof.
Possible
additions to the project - depending on grant funding - will hopefuly
include sustainable technologies such as photovoltaic panels (PV)
for generating electricity, solar water panels for hot water,
and a rain water recycling system. These will be phased in over
time.

|